SWCC Plant Valve Repairing

SWCC Plant Valve Repairing

Project Details

  • Project: SWCC PLANT VALVE Repairing
  • Location: SWCC Al Khobar Plant
  • Duration: 6 months
Description of work executed:
  • Dismantle the Bonnet assembly from the body in the pipe line
  • Inspect the components and seating area
  • Identify the cause of failure
  • Lap the seating area(Body seat) by insitu lapping machine
  • Take the wedge to machining and welding required
  • Rectify the damaged parts
  • Assembly the function test

Latest News

arrow